Posts

Showing posts from August, 2026

Five Things to Check Before a Sariya Delivery Gets Unloaded

The person who signs the delivery receipt is the last line of quality control on any site. After that signature, whatever arrived is the project's reality. Most disputes about sariya quality come after signing. Rarely do they get resolved at that point. The bars are in, the truck is gone, and proving a discrepancy is nearly impossible once bars from multiple bundles have been mixed on the ground. These five checks take under fifteen minutes. Every one of them happens before the truck leaves. Check One - Find the Grade Stamp on the Bar Every ISI-marked TMT bar carries identification stamped along the rib: the manufacturer's mark, the grade (Fe-500D, Fe-550D, or whichever was ordered), and the BIS certification mark. Pull one bar from the bundle and run your hand along the rib until you find it. It repeats at intervals. On Moira Sariya bars, the grade mark and BIS mark appear at regular intervals along the cross-ribbed surface as part of the standard production process. If the s...